We have labor markup 10%, just wondering when I print a Tech Worksheet is there a way to get actual labor times on there and not what's being billed. Our Techs are paid by the job and not hourly, so if they see a job that shows 1.1 but is actually 1 hour they think they should be given 1.1.
- ricmorin
- 5K Holy Smokes Contributor
- Posts: 5998
- Joined: Mon Jul 25, 2005 10:11 am
- Location: New Hampshire
- Contact:
Re: Tech Worksheet
Consider using one of the worksheets that show pay hours instead of billed hours.
Ric Morin - Volunteer Forum Moderator, Shop Owner, ASE Master L1
Motorcar Alternatives, LLC
603-622-6434 x203
www.motorcaralternatives.com
I find my life is a lot easier when I use Special Orders
Motorcar Alternatives, LLC
603-622-6434 x203
www.motorcaralternatives.com
I find my life is a lot easier when I use Special Orders
-
- 300 Club: Superstar Contributor
- Posts: 367
- Joined: Thu Jan 23, 2014 8:27 am
Re: Tech Worksheet
I tried that with both pay hours and charged hours and both still show the same labor timericmorin wrote:Consider using one of the worksheets that show pay hours instead of billed hours.
- timbre4
- System Guru / Moderator
- Posts: 4537
- Joined: Tue May 25, 2004 5:47 pm
- Location: TN - Volunteer State
Re: Tech Worksheet
Is it possible your Markup - Labor setting is to provide the same?
- Attachments
-
- pay.png (16.87 KiB) Viewed 4500 times
Tim McDonnell -
Sr. Product Market Mgr / Forum Moderator / Mitchell 1 Media Developer
Sr. Product Market Mgr / Forum Moderator / Mitchell 1 Media Developer
-
- 300 Club: Superstar Contributor
- Posts: 367
- Joined: Thu Jan 23, 2014 8:27 am
Re: Tech Worksheet
Yeah, we have it as Sales only. Thing is if you do Sales and Tech Pay, then that would go towards the Tech as well?timbre4 wrote:Is it possible your Markup - Labor setting is to provide the same?
Our Mitchell1 Sales Rep came in and told us to put the labor % in at 10 instead of changing the labor rate and instead of paying to the tech for the difference.
If you have Mark up at 10% for Tech and Sales, but then when you go to Tech Worksheet wouldn't it show the same as before with Pay and Charged?
- timbre4
- System Guru / Moderator
- Posts: 4537
- Joined: Tue May 25, 2004 5:47 pm
- Location: TN - Volunteer State
Re: Tech Worksheet
I share that advice with reps and shops that it is possible to discretely get some more for the work over time and not touch that visible shop rate that people get emotional about.
My remark was based on your saying that it was the same results with either style tech worksheet, which is apparently not the case.
I go to the Estimator and transfer a Brake operation @ 1.0 Hrs. With my 10% Markup setting (Shop Only) it appears as 1.1 hours on the Order screen.
When I use the Expanded Tech Worksheet w/Charged Hours it displays as 1.1 hours
When I use the Expanded Tech Worksheet w/Pay Hours it displays as 1.0 hours
My remark was based on your saying that it was the same results with either style tech worksheet, which is apparently not the case.
I go to the Estimator and transfer a Brake operation @ 1.0 Hrs. With my 10% Markup setting (Shop Only) it appears as 1.1 hours on the Order screen.
When I use the Expanded Tech Worksheet w/Charged Hours it displays as 1.1 hours
When I use the Expanded Tech Worksheet w/Pay Hours it displays as 1.0 hours
Tim McDonnell -
Sr. Product Market Mgr / Forum Moderator / Mitchell 1 Media Developer
Sr. Product Market Mgr / Forum Moderator / Mitchell 1 Media Developer
-
- 300 Club: Superstar Contributor
- Posts: 367
- Joined: Thu Jan 23, 2014 8:27 am
Re: Tech Worksheet
For whatever reason it wasn't doing it with estimates/jobs that had already been created. I put the labor mark up to what I want and on sale, then have tech worksheet printed based on pay hours and it worked when I created a new invoice.timbre4 wrote:I share that advice with reps and shops that it is possible to discretely get some more for the work over time and not touch that visible shop rate that people get emotional about.
My remark was based on your saying that it was the same results with either style tech worksheet, which is apparently not the case.
I go to the Estimator and transfer a Brake operation @ 1.0 Hrs. With my 10% Markup setting (Shop Only) it appears as 1.1 hours on the Order screen.
When I use the Expanded Tech Worksheet w/Charged Hours it displays as 1.1 hours
When I use the Expanded Tech Worksheet w/Pay Hours it displays as 1.0 hours
Not sure why it wasn't working with estimates/invoices that had already been created.
When i started the thread I had tried doing the tech worksheet print pay hours and it wasn't working on the ones that had already been created which seemed odd to me.
- timbre4
- System Guru / Moderator
- Posts: 4537
- Joined: Tue May 25, 2004 5:47 pm
- Location: TN - Volunteer State
Re: Tech Worksheet
Correct. It cannot change that which had already been transferred with the existing settings. it would be in effect for all future labor transfers from Estimator.
Tim McDonnell -
Sr. Product Market Mgr / Forum Moderator / Mitchell 1 Media Developer
Sr. Product Market Mgr / Forum Moderator / Mitchell 1 Media Developer
-
- 300 Club: Superstar Contributor
- Posts: 367
- Joined: Thu Jan 23, 2014 8:27 am
Re: Tech Worksheet
Perfect, thanks for all of the confusion, glad I got it figured out now.timbre4 wrote:Correct. It cannot change that which had already been transferred with the existing settings. it would be in effect for all future labor transfers from Estimator.